Skip to content
ac monogram

Services

Example of an exterior rendering

Exterior rendering

Facades, entrances and the building's surroundings.

Before you start

What does it show?
Facade, entrances and surroundings, by day or by night.
What do we need from you?
CAD drawings or a model, materials and a reference or two.

How we work

  1. Drawings and surroundingsday 1
  2. Model and framingdays 2-3
  3. Light and materialsdays 4-5
  4. Revisions and deliverydays 6-7

What you get

Format
4K JPG, and layered PSD on request.
Typical timeframe
One week per view.
Revisions
Two rounds included.
View projects of exterior rendering
Example of an interior rendering

Interior rendering

Interior spaces with materials, furniture and light.

Before you start

What does it show?
Each room with its materials, furniture and light.
What do we need from you?
Floor plans, elevations and a list of materials or references.

How we work

  1. Drawings and furnitureday 1
  2. Model and framingdays 2-3
  3. Materials and lightdays 4-5
  4. Revisions and deliverydays 6-7

What you get

Format
4K JPG, and layered PSD on request.
Typical timeframe
One week per view.
Revisions
Two rounds included.
View projects of interior rendering
Example of real estate marketing visuals

Real estate marketing visuals

A set of images for off-plan sales.

Before you start

What does it include?
Exterior views, interiors of the typical unit and furnished floor plans.
What do we need from you?
Basic design, specifications report and sales schedule.

How we work

  1. Drawings and specifications reportweek 1
  2. Complete modelweek 1
  3. Views and floor plansweek 2
  4. Revisions and deliveryweek 3

What you get

Format
Images for web, brochure and billboard; furnished floor plans in PDF.
Typical timeframe
Two to three weeks.
Revisions
Two rounds per image.
View projects of real estate marketing visuals
View from a 3D walkthrough of a hotel

3D animation

A video walkthrough of the project.

Before you start

How long is it?
Between thirty and ninety seconds.
What do we need from you?
The model or drawings and an idea of the route.

How we work

  1. Script and routeweek 1
  2. Model and camerasweek 2
  3. Rendering and editingweek 3
  4. Review and deliveryweek 4

What you get

Format
MP4 in 1080p or 4K, and a vertical version if needed.
Typical timeframe
Three to four weeks.
Revisions
One for the route and one for the edit.
View projects of 3D animation

360° virtual tour

Navigable panoramas on any device.

Before you start

Where can it be viewed?
In any browser, mobile included, with a link.
What do we need from you?
Drawings and materials for each room.

How we work

  1. Drawings and roomsdays 1-2
  2. Modeldays 3-5
  3. Panoramasdays 6-8
  4. Viewer and deliverydays 9-10

What you get

Format
Shareable web link, also for touchscreens.
Typical timeframe
One to two weeks.
Revisions
Two rounds included.
View projects of 360° virtual tour
Example of a competition image

Competition images

Images for competition boards on short deadlines.

Before you start

How soon?
Between five and ten days, depending on the number of images.
What do we need from you?
The competition brief, the model or drawings, and the idea behind the project.

How we work

  1. Brief and framingday 1
  2. Quick modeldays 2-4
  3. Imagedays 5-8
  4. Deliverydays 9-10

What you get

Format
Whatever the competition brief asks for, ready for the board.
Typical timeframe
Five to ten days.
Revisions
One round, given the competition deadlines.
View projects of competition images

Timeframes are approximate and depend on the project.